Thursday, June 6, 2013

Complete new cement plant

1 unit complete new cement plant
500.000 To clinker per year
Including ERECTION and Supervision
Year Of Build: 2013
Manufacturer: F.L. Schmidt / China licensed ISO certified
Delivery, assembly, erection and putting in operation of a complete cement production
Plant with a capacity of 0.5 Mio to clinker per year (0.6 Mio to grey cement per year).
The Plant has been projected and manufactured from one of the largest and leading Europe-Chinese cement plant manufacturers. All parts and equipment are completely new.
Design and layout of the plant is for production of Portland cement, Type 42.5
R/N. The dry process is very well known and can be inspected and controlled in many production plants erected by this manufacturer.
The complete equipment, devices and accessories can be inspected and controlled on site/location of manufacturer before loading.
 
 
Price complete as described 70,000,000 Millon EUROS

Saturday, June 1, 2013

CRUISE SHIP


 
 
 
Year Build: 2001
LOA:      286.3 Ft.
Breadth:   50   Ft.
Draught:   20   Ft.

Gross Tonnage: 4954  ITC
Net Tonnage:   1486  ITC
Air Draft:       96.5 Ft.
Cabins: 110 Beds: 220
Outside 2 Bed:    101 Cabins / 202 Beds
Inside 2 Bed:       9 Cabins /   18 Beds
Crew Cabins:
1 Bed W/Facilities  7
2 Bed W/Facilities 36 Cabins / 72 Beds

$25,000,000.00

Amphibious Aircraft


Exterior: All White Exterior, Painted in 2003 – Excellent Condition
Airframe: 16,044 Hours TTS NEW
275 Hours since Extensive Rework by Victoria Aircraft Maintenance.
Engine: Pratt & Whitney PT6A-34 Turbo Props, 600 S.H.P. Each LH: 6,561 TTSNEW.
2,428 SMOH by Airwork, Time Since Hot Section: 275 hours by Standard Aero RH: 6,529 TTS NEW.
2,460 SMOH by Airwork, Time Since Hot Section: 275 hours by Standard Aero
August 6th 2012 price reduced $ 1,680,000.00